When a drainage issue arises, most decision-makers are forced to rely on outdated tools that leave them practically blind to what is happening beneath their concrete.
When raw sewage backed up into a basement, Lovett Services deployed our powerhouse in house crew to handle the entire disaster. Six dedicated departments seamlessly managed containment, excavation, and plumbing all under one roof. Zero stress and zero surprises.
A sewer belly buried under a concrete slab. A repair bill that could easily hit $50,000. A property manager without the budget. Here's what we did instead, monthly hydro jetting at $600/month, and why it's working.
Three deteriorating catch basins at Boones Ferry Business Park needed replacement before stormwater failures caused expensive downstream problems. Lovett completed full drainage restoration in just 1.5 days.
Every hour a service truck sits on your property is an hour of disruption. We added the Rival T7 Vacuum Truck to our fleet specifically to protect your bottom line, getting jobs done faster with less disruption.
Multiple downstairs units reported simultaneous drain backups, a diagnostic pattern pointing to main sewer line failure. A previous contractor couldn't clear it. We resolved it in 4 hours for $920 total.
Lovett Inc. has appointed Gary Cosmer as President & Chief Operating Officer, bringing over 25 years of operational leadership experience to accelerate the company's growth strategy.
EC Electric and LOVETT Inc. announce a partnership to install EV charging infrastructure at Ron Tonkin Dealerships using horizontal directional drilling, eliminating disruption to occupied properties.
We’d love to feature it. If you’re a client, partner, or industry contact with a project story or industry update worth highlighting, reach out to our team.