The Project Baseline
To keep a rapidly moving commercial build profitable, the sequence of events is everything. When the underground infrastructure phase drags on, the subsequent trades are left standing around waiting.
Who We Serve
Commercial Electrical Companies and Contractors ready to pull wire for major new builds & utilities.
Project Setting
High traffic commercial new construction sites in the Portland Metro & surrounding area. The environments feature highly congested workspaces and extremely strict scheduling deadlines.
The Bottleneck Challenge
Your electrical contractor is completely mobilized and ready to work. However, their crews are grounded until the underground pipes are successfully installed and ready for wire.
They have to dig the starter holes, manage the extremely messy drilling mud, and try to operate the complex drill rig itself.
When a pipe installation that should take two days stretches into an entire week, the electrical scope gets pushed back. This single delay threatens your overarching project deadline and heavily inflates daily labor costs.
Expert Insight
“When an electrical crew has to wait three extra days for the underground pipe to be ready, the delay does not just affect them. It pushes back the concrete pour, delays the framing crew, and throws the entire project calendar completely off track. Getting the underground right the first time protects the rest of the schedule.”
The Lovett Advantage: Specialists Over Generalists
Instead of waiting on a generalist to figure things out, partner with Lovett Services. We do not send a completely generalized crew. We deploy dedicated business units to handle each phase simultaneously.
Dedicated Drilling Teams
Our directional drilling unit focuses on one primary thing: DRILLING. Because they execute underground bores every single day, they set up the machinery faster. They navigate the underground drilling path with complete accuracy, and they execute the final pipe installation without the hesitation that plagues generalists.
Internal Support Units
When starter pits need to be excavated and existing utility lines need to be safely uncovered, our drillers do not stop working. We immediately dispatch our dedicated Excavation and Vacuum Truck business units to handle the site prep work.
The Secret to Faster Drilling is Mud Management
Drilling underground creates a massive amount of liquid mud. Generalist contractors often have to stop drilling completely to clean it up with a shovel or wait for a rental truck.
The Outcome
Because Lovett utilizes specialized teams working together seamlessly rather than one crew stretching themselves too thin, the underground phase is completed in record time.
No Scope Gaps
Zero arguments over who is supposed to dig the entry pit.
No Wait Times
Zero delays waiting for outside vacuum trucks to arrive for mud cleanup.
Rapid Handoff
The site is handed back to your electrical crew days ahead of a standard generalist schedule.
Expert Insight: Providing the Proof
Stop letting generalist contractors bottleneck your projects.
By deploying dedicated business units for drilling, excavation, and vacuum services, Lovett ensures your trades can get to work exactly when they are supposed to.